Site Setup
Project details and room inventory
Site Information
Add Rooms
Quick templates
Floor Plan
Draw any shape — snap to grid, edit dimensions manually
Tap corners to build polygons. Snap grid aligns to 200mm intervals. Select a shape to edit its exact dimensions below.
Snap
On
Grid
Scale
Assign
Shapes: 0
Fixtures: 0
Area: 0m²
Legend
Draw rooms above.
Fixtures & Survey
Manufacturer details, photos, condition per room
Energy & Carbon
Current vs proposed — live calculations
—
Current kWh/yr
—
Proposed kWh/yr
—
Annual saving
—
Payback (yrs)
Proposed System
Proposed kWh calculated from actual product wattages selected in the Library tab. Fixtures without a selection use the fallback % below.
%
Type any value
e.g. 10, 25, 60
e.g. 10, 25, 60
—
tCO₂ saved/yr
—
Net benefit
saving minus install cost
—
Net benefit ×2
saving minus install cost
Maintenance Saving (optional)
LED's longer life means fewer lamp changes. Add avoided maintenance cost to strengthen the payback case — particularly compelling for high-bay and emergency fittings.
Annual avoided maintenance
£0/yr
Revised payback (energy + maintenance)
—
Room Breakdown
| Room | Current W | Proposed W | Current kWh | Proposed kWh | Saving £/yr |
|---|
Controls
Per-room strategies + global savings model
Controls add 20–50% further saving on top of LED upgrade.
Per-Room Strategy
Select a room above.
Savings Stack
Presence Detection
£0/yr
35%
Daylight Harvesting
£0/yr
40%
Time Scheduling
£0/yr
50%
DALI-2 Scene Control
£0/yr
15%
£0
Extra saving/yr
—
Revised payback
Luminaire Library
Select LED replacements · Add custom products
Supplier Comparison
Selected Replacements
0 selectionsNo replacements selected yet.
Quotation
Build, price and issue your proposal
REF: LMO-2026-001
—
Sync items from your library selections or add manually below.
Margin Settings
All figures shown ex-VAT. Add VAT at the appropriate rate when issuing the final invoice.
Labour Rate Card
ROI Summary
Enter what the incumbent is proposing — Cirva will build the full commercial case showing why your solution wins on total cost of ownership.
Incumbent Proposal
Your Proposal — auto from survey
Complete your quote first, then return here.
Survey Report
Full summary ready to share
Lighting Survey
Current vs Proposed
| Metric | Current | Proposed | Saving |
|---|
Controls Impact
| Control | Status | Saving/yr |
|---|
Rooms
| Room | Area | Lux | Status | Cond | Photos |
|---|
Manufacturer Log
| Room | Mfr | Model | Qty | W |
|---|
Recommendations
Export
Excel workbook, PDFs, Bill of Materials
Pre-Export Checklist
Run checklist before exporting.
Full Excel Workbook
13-tab workbook: all survey data, energy, controls, quotation, ROI, compliance, carbon
PERSONAL+Survey Report PDF
Clean branded report — site summary, rooms, energy analysis, recommendations
FREEQuotation PDF
Professional client-ready quotation with line items, margins, ROI and terms
PERSONAL+Project Data CSV
Structured project, room and fixture data — import into CRM, ERP or spreadsheet
PERSONAL+Bill of Materials (CSV)
Complete product schedule with part numbers and quantities for procurement
PERSONAL+Preview
Settings
Account, white-label, team, client portal
Account
Free Plan
Upgrade to unlock more features
White-Label Branding
BUSINESSTeam Members
BUSINESSClient Portal
PERSONAL+Insights
Compliance · Finance · Rebates · ESG
All sections auto-populate from your survey data. Override any value manually where needed. Everything feeds into the PDF report and Excel export.
Compliance Scoring
WELL v2 · BREEAM UK · LEED v4 · EN 12464-1
Room-by-room lux compliance (EN 12464-1)
| Room | Measured | Target | Status | CCT | CRI |
|---|
Finance & Leasing
Capital · Operating Lease · Lighting-as-a-Service
Full upfront investment — lowest total cost, fastest payback.
Calculate energy first to auto-populate
Spread the cost — preserve capital, maintain balance sheet flexibility.
Set terms above
Lighting-as-a-Service — client pays per point per month. Zero capex. Includes maintenance.
Set rate above
Rebates & Incentives
SALIX · ESOS · Local grants · Enhanced Capital Allowance
Custom Incentive
Circularity & ESG
Scope 2 · Carbon reduction · Waste · Circular economy
GHG Emissions (Scope 2)
Circularity
ESG Statement